In designing the plan for a new school in the city of Tibro, one of the main considerations was safe access to the facility. This would require the construction of an underpass underneath road 201 in Tibro.
Design requirements included:
Design requirements
The Swedish Transport Administration had also decided on a soil-steel bridge, thanks to its easier, more cost-effective construction.
The Solution
ViaCon Sweden provided a solution in the form of two ready-made tunnels, reinforced on top with extra plates.
The resulting steel structure had the following measurements:
The ViaCon Advantage
With ViaCon, the underpass provided safe access to the new school and also delivered other benefits, including:
Stakeholders
Investor: City of Tibro