A ViaCon bridge rebuild kept traffic moving and wildlife connected – installed in just 12 days.
The Challenge
A deteriorated bridge on the federal highway B183a, west of Delitzsch in Germany, needed replacement to keep a busy route safe and operational. The solution had to be durable, quick to build, and cause minimal disruption while preserving the wildlife crossing beneath to improve safety for both people and animals.
The Solution
ViaCon supplied a modular bridge using ViaPlate 500. The approach allowed rapid onsite assembly with predictable quality, reducing construction time and disturbance compared to traditional methods. The wildlife corridor remained part of the design, creating a reliable connection between nature and modern infrastructure. Net assembly time on site was 12 working days.
The ViaCon Advantage