ViaCon delivered an underpass structure for the TSF Haul Road Southern Road project in Turkey, enabling vehicle traffic in an active gold mine while meeting demanding time and load requirements. 

The Challenge 

At the TSF Haul Road Southern Road (5-way tunnel) project, the customer, Anagold Mining, needed a tunnel solution to accommodate vehicle traffic within an active gold mine. 

The project had to be carried out in a demanding operating environment where ongoing mining activity placed strict requirements on timing, coordination and execution. Tight deadlines were a key challenge, as the solution needed to be delivered and installed quickly without disrupting operations more than necessary. 

The structure also had to meet demanding technical requirements, including high live loads, controlled backfilling conditions, seismic considerations and long-term durability under mining site conditions. 

The Solution 

ViaCon proposed a ViaPlate 380 structure as an underpass solution designed to accommodate vehicular traffic both over and under the structure. 

The tunnel was delivered with a span of 12 m, a height of 5.65 m and a length of 51.19 m. The design also included bevels of 1:1.61, a 70° skew angle and a plate thickness of 5.5 + 5.5 mm. 

To meet the project’s structural requirements, the SC-10NA structure was strengthened with additional ribs made from 5.5 mm plates in areas exposed to higher loads, spaced at 1524 mm c/c. The structure was designed in accordance with the contractor’s requirements, including: 

  • live load: 85 kN/m², 
  • cover depth: 1.85 m under the road, 
  • backfilling: aggregate compacted to 98% standard Proctor density, 
  • seismic effect: horizontal acceleration ratio Ah = 0.4, 
  • durability requirement: 40 years, 
  • corrosion protection: zinc coating conforming to EN ISO 1461. 

Because the project was located within an active mining site and subject to strict time constraints, workforce and operational capacity were increased and additional shifts were introduced to maintain the required pace. 

The ViaCon Advantage 

ViaCon was selected because the customer was looking for a rapid solution and saw ViaCon as a market-leading supplier for this type of structure. 

The project demonstrates the advantages of a prefabricated steel underpass solution in a demanding mining environment: fast delivery, efficient installation and a design adapted to high loads and complex site conditions. 

The customer expressed strong satisfaction with both the pace of the project and the organisation of the work, and the contact has been maintained for future opportunities. 

Technical specifications

  • Project: TSF Haul Road Southern Road (5-way tunnel) 
  • Customer: Anagold Mining 
  • Application: Tunnel/underpass construction for vehicle traffic in a gold mine project 
  • Profile: ViaPlate 380 
  • Span: 12 m 
  • Height: 5.65 m 
  • Length: 51.19 m 
  • Slope/bevels: 1:1.61 
  • Angle: Skew angle 70° 
  • Plate thickness: 5.5 + 5.5 mm 
  • Live load: 85 kN/m² 
  • Cover depth: 1.85 m 
  • Backfill requirement: Aggregate compacted to 98% standard Proctor density 
  • Seismic design parameter: Ah = 0.4 
  • Durability: 40 years 
  • Corrosion protection: Zinc coating according to EN ISO 1461 
  • Reinforcement: Additional 5.5 mm ribs at 1524 mm c/c in higher-load areas